Simon Ariel Boom Lift (SOLD)
Item ID
3599
Category
Material Handling Equipment
Asset ID
24T-229
Condition Code
Poor Used Condition
UOM
Each
Price
$950.00
Quantity
0
Division
AEP - Indiana & Michigan
Equipment Location
ROCKPORT - ROCKPORT , IN
Condition Code
Poor Used Condition
Short Equipment/Material Description
Simon Ariel Boom Lift
Year: Unknown
Manufacturer: Simon Ariel Boom Lift
Weight: Unknown
Dimensions: 24' x 8' x 6.5' boom retracted.
Additional Details: Unsure of the model it could be AT40C or AT60C.
When was it last used? Over 2 years ago
Is it in working condition? Unknown
Will AEP/Site load onto the buyer's transport? Yes
Will AEP/Site prepare the item for shipment? No
Known Concerns: Unknown. Unit has been sitting unused for years. Condition unknown. Unit will need to be towed from the site.
Buyer Please Note
- All Items are sold AS IS WHERE IS. No warranty is given or implied.
- TEST OPERATION of the item will not be permitted
- TAXES - The Buyer is responsible for any local and state sales taxes for the state where the transfer of ownership occurs. Sales taxes will be added to the purchase price and included on the invoice unless the Buyer provides a tax exemption or resale certification for the state where ownership transfer occurs.
- PAYMENT must be received within fifteen (15) days of the date of the sale Contract.
- REMOVAL OF GOODS must be completed within fifteen (15) days of receipt of payment.
- KNOWN CONCERNS are what have been observed by the business unit selling the item and have not been validated by a technician. Areas not listed as known concerns or None do not imply any warranty as to life or condition and only imply that a concern was not noticed by the previous user. This item is being sold AS IS WHERE IS in its existing condition.
- Buyer Requirements for Goods purchased that require on site work for removal from AEP site:
- INSURANCE - Before any disassembly work is performed onsite, the Buyer and its subcontractor(s) shall provide a certificate of insurance satisfying the requirements of section 10 of the Asset Recovery Bill of Sale Terms and Conditions. .
- WORK PLAN - The Buyer will be required to submit to AEP a detailed work plan. The work plan must describe in depth the work necessary to remove the goods from the AEP site. If AEP approves the work plan, the Bill of Sale will be sent to the Buyer for signature. If the work plan is not approved, AEP will not move forward with the sale.
Product Attachment Documents
229 61.jpg